The end of the year is when many businesses set budgets and plan maintenance for the next twelve months. If your offices, shop or premises rely on air conditioning or air-to-air heat pumps, it’s worth adding your cooling and heating equipment to that list. There are legal checks that apply to many commercial systems, and a scheduled change to refrigerant supply in Great Britain from January 2027 that’s useful to understand before you plan any repairs or replacements.
Here’s a plain-English checklist.
1. Know what you have
Start with a simple list of your equipment: where each indoor and outdoor unit is, the make and model, roughly when it was installed, the type of refrigerant it uses and how much it holds. This information is usually on the outdoor unit’s rating plate or in your installation and service paperwork.
It sounds basic, but almost everything else on this list depends on it. The refrigerant type and charge decide how often your system needs leak checks, and the total output of your units decides whether an energy inspection is required.
2. F-gas leak checks
Most air conditioning and heat pump systems use fluorinated gases (F gases) as refrigerant. Under the GB F-gas rules, if you use stationary air conditioning or heat pump equipment, you’re responsible for getting it checked for leaks. How often depends on how much refrigerant the system contains and its global warming potential, measured as tonnes of carbon dioxide equivalent.
According to the GOV.UK guidance on checking F-gas equipment for leaks:
- Equipment containing 5 to less than 50 tonnes CO2 equivalent must be checked at least every 12 months. For R-410A, one of the most common refrigerants in existing air conditioning, that starts at around 2.4kg of refrigerant.
- Equipment containing 50 to less than 500 tonnes must be checked at least every 6 months.
- Equipment containing 500 tonnes or more must have an automatic leak detection system.
- Fitting automatic leak detection allows you to double the time between checks.
If a leak is found, it must be repaired as soon as possible and the system re-tested within a month. Not having the right checks in place, or not fixing leaks, can lead to a civil penalty.
3. The five-yearly air conditioning energy inspection
Separately from leak checks, the Energy Performance of Buildings Regulations in England and Wales require air conditioning systems with an effective rated output of more than 12kW to be inspected by an accredited energy assessor at intervals of no more than five years. This is often called a TM44 inspection, after the CIBSE guidance it follows.
Two points that often catch businesses out:
- Several smaller units can count as one system. Where one person controls more than one unit in a building, their outputs are added together, so a few wall-mounted units in one office can take you over 12kW.
- The inspection has to be carried out by an accredited energy assessor, and GOV.UK states that you can be fined £300 if you don’t have it done.
The assessor’s report covers the efficiency of your equipment and suggests improvements. Keeping your system well serviced before the inspection, with clean filters and coils, working controls and up-to-date records, makes it easier to act on what the report says.
4. The January 2027 refrigerant phase-down step
Great Britain is gradually reducing the amount of hydrofluorocarbon (HFC) refrigerant that can be placed on the market. In May 2026, Defra confirmed that it won’t change the schedule for 1 January 2027, so the existing phase-down step goes ahead. The industry body FETA has summarised this as the quota falling from 31% to 24% of baseline values.
The Institute of Refrigeration has noted that the phase-down will make higher-GWP refrigerants harder to get and more expensive. This doesn’t mean existing R-410A systems have to be removed. They can still be serviced and maintained. It does mean it’s sensible to keep them leak-free, and to think ahead about when older equipment might be due for replacement.
5. Planning replacements
Since 1 January 2025, new single split air conditioning systems holding less than 3kg of refrigerant with a global warming potential of 750 or more, which includes R-410A, can’t be placed on the GB market (GOV.UK). Many current systems use lower-GWP refrigerants such as R-32 instead.
If an older system is becoming unreliable, a planned replacement at a quieter time of year is usually less disruptive than an emergency one in a summer heatwave. Modern reverse-cycle systems also provide heating, which can be worth considering if you’re reviewing how your premises are heated.
How PDQ can help
PDQ Air Conditioning has been supplying, installing, servicing and maintaining air conditioning and heat pumps for homes and businesses since 2004. Based in Borough Green near Sevenoaks, we cover Kent, Sussex, Surrey, London and Essex. We supply, install and support Haier, Samsung, Hitachi and Midea systems, and we service and maintain Daikin, Mitsubishi and Fujitsu units, as well as systems installed by others.
If you’d like help putting together an equipment list, arranging regular servicing and leak checks, or planning a replacement for an older system, we’ll give you clear, honest advice. Contact us here, call 01732 884703 or email info@pdq-airconditioning.com. You can also request a quote online.